Linked Keyfields (part Revision)

Training Manuals Alphabetical Function List Back Print this Topic Previous topicOne level upNext topic
Show/Hide Hidden Text

On this tab the following fields can be viewed:

 

hmtoggle_plus1Project-3 2

This field is applied to identify changes/deletes to Bills of material that are Project specific.

If selected, as populated from the table Project Serial number range, it implies that the changes to the Product Structure do not apply to the "Standard BOM", but only to the Project specific BOM where serial number effectivity (rather than date effectivity) applies.

 

Keyfield 1 on the table Product structure is "Project". If spaces, it represents the standard Engineering BOM. If <> spaces, it implies a BOM that is speciifc to the selected Project only.

See help for Product structure and Project serial number range for more detail.

 

This field is also applied to identify changes/deletes to Part Operations (routings) that are Project specific.

If a project is selected, it implies that the changes to the Part operations do not apply to the "Standard Routing", but only to the Project specific routing for a manufactured item.

Key field 1 on the table Part Operation is "Project". If spaces, it represents the standard Routing. If <> spaces, it implies a routing that is specific to the selected Project only.

 

See help for Part Operations for additional detail.