Navigation:  Engineering > Product Structure > X Files 47 >

Offset Lead Time

Training Manuals Alphabetical Function List Back Print this Topic Previous topicOne level upNext topic

It is a technique used by MRP where a planned order

receipt in one time period will required the release of

that order in an earlier time period based on the lead

time for the item.

 

It is a slider that can be between 0 and 120 and lead

time can be manually entered in the box below the

slider.

 

The slider is automatically be adjusted when the user

enters a number in the box.