It is a technique used by MRP where a planned order
receipt in one time period will required the release of
that order in an earlier time period based on the lead
time for the item.
It is a slider that can be between 0 and 120 and lead
time can be manually entered in the box below the
slider.
The slider is automatically be adjusted when the user
enters a number in the box.